Sampling of installed equipment with potential for reuse or scrap including motors, compressors, pumps, cranes and hoists, conveyors, shredders, picking stations and two GE steam turbines powered by three large boilers.

PBF Turbines

Thermal Regenerative Oxidizers

1 Primary and 1 Secondary Magnet

2 Boilers WPF

2 Ton Hoist at WPF Baghouse

5 Ton Hoist at Primary Shredder

5 Ton Hoist at Primary Shredder2

5A Boiler Feed Pump – same as 5B-6A-6B

5A Booster Boiler Pump – same as 5B-6A-6B

10 Ton Hoist near air duct

2 Ton Hoist at WPF Secondary Shredder

50 ton Hoist in Turbine hall

500 HP Primary Shredder Motor – 2 of them

1000HP Secondary Shredder Motor -2 of them

1000HP Secondary Shredder Motors – 2 of them

1250HP Primary Shredder Motor

1250HP Primary Shredder Motor2

1250HP Secondary Shredder Motor spare

250HP Secondary Shredder Motor – 2 installed

Chemical feed pumps – 2 per turbine, one per boiler

Circ pump in north screenhouse

Fish screen wash pump

Fish screen wash pump2

Hoist -spare- for WPF Baghouse Bag install

PBF Baghouse hoist on tower

Machinery1

Picking Station

Sanitary lift pump – two of them

Sanitary lift station – two pumps

Scrubber makeup pumps – 2 of them

Service Water Pump 1A

Submersible Pump – 2 in each of two pits

sump pump in corner

Waste Processing Facility

Secondary Shredder coupling

Waste Processing Facility2

Waste Processing Facility3